Photos of events, projects, behind the scenes preparations, fundraisers and more.

|

|

|

|

|
Lettering project. The lodge was painted in 2013 and the letters were taken down to be cleaned and painted. In 2014 a cherry picker was rented and a team of bretheren got the job done.
|
Sump pump project. After a flood in the crawlspace spring of 2014, a hole was dug and a sumppump installed with a drainage trench.
|
Painting the Lodge. The lodge was re-painted in 2013.
|
Wheel chair ramp. In conjunction with Barkerville Historic Town a ramp was built in 2012
|
Foundation work. The entire foundation of the lodge was completely re-done in the fall of 2011.
|

|

|
|
|
|
Lower Hall project. The lower hall was furnished with a custom made buffet table, a new bar and new tables and chairs. Spring of 2016.
|
Lower Hall floor
A new floor was laid in the hall and foyer. Spring of 2019.
|
|
|
|